Eighth Semester
Transportation & Storage of Petroleum
Code :PE421 Unit : 6 Prerequisite : GS225, PE326
Design of Oil Pipelines: Major & Miner Pressure Drop, Optimum Pipe Size, Hydraulic Gradient Curves - Mechanical Design - Pressure Drop Using Monographs - pumping stations arrangement - Design of Gas Transmission Pipelines: Pressure Drop, Pipe Line Storage Capacity, Optimum Pipe Diameter, Gas Hydrate - Two-Phase (Liquid & Gas) Flow: Type of Flow, Pressure Drop, Correlations for Multiphase Flow - Petroleum Storage Tanks: Optimum Tank Proportions, Mechanical Design - Pressure Vessel Design: Optimum Proportions, Mechanical Design, Wind Effect, Spherical Tanks.


Enhanced Oil Recovery
Code : PE422 Unit : 9 Prerequisite : PE321
Outline of EOR Methods and Common Factors Affecting them – Fluid Distribution and the Theory of Frontal Displacement – Buckely - Leverett Theory - Injection Well Location - Water Injection: Water Injection Performance Calculations for Homogenous and Stratified Formations - Gas Injection: Gas Injection Performance Calculations - Miscible Drive: High Pressure Dry Gas Injection - Enriched Gas Injection - Liquefied Petroleum Gases - Alcohol Slug Injection - Carbon Dioxide Injection - Chemical Flooding: Surfactant Injection, Polymer Flooding, Caustic Flooding, the Use of Micro Emulsions – Thermal Recovery Methods: Hot Water Injection, Steam Injection, Cyclic Steam Injection, In-Situ Combustion(Forward and Reverse Combustion).


Safety & Loss Prevention
Code : PE423 Unit : 6 Prerequisite : -----
Introduction - Type of Hazards and Hazardous Materials - Hazards Dealing with Oil Industry - Safety Equipment’s - Factors Enhance Safety: Training, equipment’s, periodic inspection, etc. - Environment Pollution from Oil Industry - Accidents - Reports.


Project
Code : PE424 Unit : 18 Prerequisite : -----
Experimental and/or Theoretical Approaches with Possible Application of Computer Techniques to Integrate Various Components of the Curriculum in a Comprehensive Engineering Design Experience - Design of a Complete Project Including: Identification of a Problem, Formulation of Design, Preparation of Specifications - Consideration of Alternative Feasible Solutions - The Work will be Supervised by a Faculty Member - The Student has to Submit a Detailed Final Project Report and Present his Work.


Petroleum Engineering Economics
Code : PE425 Unit : 9 Prerequisite : -----
Introduction - Interest: Simple Interest, Compound Interest, Continuous Interest - Present Day Value and Discount Annuities - Depreciation: Type of Depreciation, Methods for Calculating Depreciation, Straight Line Method, Declining Balance Method, Sum of the Year Digits Method – Capital Investment - Estimation of the Total Production Cost – Petroleum Engineering Economics..


Elective Course
Code : PE426 Unit : 9 Prerequisite : -----
English Language VIII
Code : ES427 Unit : 1 Prerequisite : ES418